Tiling that looks right on day one but fails within a year is almost always a preparation problem. Tiles fixed to an uneven substrate, grout not rated for wet areas, shower walls never tanked before tiling, these are the mistakes that cause cracked tiles, damp patches, and grout failure that costs more to fix than the original job. At EBT Build, every tiling project starts with a surface assessment and every wet area is waterproofed before any tile is fixed.
We carry out wall and floor tiling for bathrooms, kitchens, hallways, outdoor spaces, and commercial properties across Islington, Camden, Hackney, Haringey, and surrounding North London areas. Every project is completed by our own tiling team from first fix through to final sealed handover with no subcontracting at any stage.
Certified engineers for all gas work, safety checks, boiler installations, and compliance.

Electrical work carried out, tested, and certified to current UK regulations.

Public & employer liability insurance in place for complete peace of mind.

Consistently rated for workmanship, reliability, and project management.

Delivering home refurbishment and roofing projects with controlled processes, certified trades, and accountable project management.

Every tiling project at EBT Build covers the following as standard. Nothing is charged separately after the quote is agreed and no stage is skipped regardless of project size.
Our tiling services cover everything required to deliver a clean and durable tiled surface. We begin with inspection and planning, then complete installation with correct fixing and sealing. All work is completed using suitable adhesives and methods for each tile type. The result is a professional tiled finish delivered without delays or rework.

We install wall and floor tiles in bathrooms including full waterproof tanking in shower enclosures and wet areas before any tile is fixed. Substrate condition is checked and levelled where required before installation begins.

We fit kitchen wall tiles and splashback panels using heat resistant adhesive and correctly rated grout throughout. Cuts are made accurately around sockets, switches, and kitchen units to ensure clean edges and consistent spacing.

We lay floor tiles in porcelain, ceramic, and natural stone across hallways, kitchens, and living areas. Subfloor condition is assessed and levelled before any tile is set to prevent movement, cracking, or uneven surfaces after installation.

We install wall tiles in living areas, hallways, and feature spaces using consistent joint spacing and level setting throughout. Tiles are checked for plumb on every wall before fixing begins to ensure the finished surface is straight and even.

We carry out outdoor tiling for patios, entrances, and external steps using frost resistant tiles and exterior grade adhesive and grout. Drainage falls are checked and set correctly before any tile is laid to prevent standing water on the finished surface.

We remove and replace damaged, cracked, or hollow tiles across all areas of the home without disturbing surrounding tiles where possible. Substrate condition behind removed tiles is inspected and repaired before new tiles are fixed.

Most tiling problems are not visible on the day the job finishes. Tiles that were not fixed to a level substrate, grout that was not rated for wet areas, wet room walls that were never tanked, these failures show up months later as cracked tiles, failed grout lines, and water damage behind the surface. At EBT Build, every tiling project starts with a proper surface assessment and every wet area is waterproofed before a single tile goes up.
We carry out tiling across bathrooms, kitchens, hallways, and outdoor spaces throughout Islington, Camden, Hackney, and Haringey. Every project is completed by our own tiling team with no subcontracting, and every quote is written and itemised before work begins.
EXCELLENT Based on 7 reviews Posted on Google Ashley BurenTrustindex verifies that the original source of the review is Google. Brilliant roofing job and refurbishments in Hackney! We hired EBT Build and they were no-nonsense and got straight to work. The work included: new kitchen and kitchen fitting, full rewiring, new plumbing, plastering, painting, all flooring, skirting boards and new doors. We agreed on a reasonable price and the end result was exemplary. Would highly recommend EBT Build to everyone looking for reliable trades in the area.Posted on Google Rhod WilliamsTrustindex verifies that the original source of the review is Google. EBT team renovated my bathroom and kitchen to a fantastic standard. They were really professional and efficient. Could not recommend more! Thank you to the whole team but especially Tilly!Posted on Google Ana OsmaniTrustindex verifies that the original source of the review is Google. “I know choosing a builder can feel like a gamble, but this team won’t let you down. They completed our roofing, plastering and painting work on our property in Islington, and we can’t praise them enough. The workmanship is faultless — they’re punctual, friendly, and kept everything as tidy as possible throughout the job. Attentive to detail and very helpful. Highly recommended!”Posted on Google Nick MorganTrustindex verifies that the original source of the review is Google. Our extension project in Haringey took a few weeks and the whole experience was really great. The team was polite, respectful, and explained everything clearly without confusing us with technical jargon. They worked efficiently, kept things tidy, and we’re absolutely delighted with the finished result. Would happily recommend EBT Build to anyone!Posted on Google John BamlingTrustindex verifies that the original source of the review is Google. We were really pleased with the work completed by EBT Build. Everything they did exceeded our expectations. They were punctual, kept the site tidy at all times, and were thoroughly professional throughout. They carried out new roofing, kitchen installation, plastering and decorating for us in Kentish Town, and every part of the job was finished to an excellent standard. They took great care with every detail, and their fees are very reasonable too. We would highly recommend them, and will definitely use them again for any future building work.Posted on Google derekTrustindex verifies that the original source of the review is Google. I am delighted to highly recommend EBT Build. They carried out a full refurbishment and loft conversion at my property in Hackney, and I am very pleased with the result. The team were hardworking, punctual, reliable, and always helpful throughout the project. The work was completed to a high standard with great attention to detail, and nothing was ever too much trouble. They were professional from start to finish, and I would happily recommend EBT Build to anyone looking for a trustworthy and reliable building company.Posted on Google Diana KoroTrustindex verifies that the original source of the review is Google. EBT Build Ltd completed a full refurbishment of our property in Camden Town, including plastering, painting, a new kitchen, a new bathroom and a full rewire. The team were professional, reliable and hardworking throughout the project. The quality of workmanship was excellent, with great attention to detail from start to finish. Nothing was too much trouble, and the work was completed to a very high standard. We are extremely pleased with the finished result and would highly recommend EBT Build Ltd to anyone looking for a reliable and skilled building company.Verified by TrustindexTrustindex verified badge is the Universal Symbol of Trust. Only the greatest companies can get the verified badge who has a review score above 4.5, based on customer reviews over the past 12 months. Read more
We tile across all room types and surface areas in residential and commercial properties throughout Islington, Camden, Hackney, Haringey, and surrounding North London areas.
We tile full bathrooms and wet rooms including shower enclosures, bath surrounds, walls, and floors across North London properties. All wet areas are tanked before tiling begins regardless of the size of the project, and substrate condition is confirmed before any tile is fixed.
We install kitchen wall tiles, splashbacks, and floor tiles in kitchens and utility rooms throughout Islington, Camden, and surrounding areas. Surfaces around hobs, sinks, and worktops are tiled using heat and moisture resistant adhesive and grout rated for kitchen conditions.
We lay floor tiles in hallways, open plan living areas, and reception rooms where a durable and easy to maintain surface is required. Subfloor preparation and levelling is carried out before any tile is set to prevent movement or cracking after installation.
We carry out outdoor tiling for patios, front entrances, steps, and external walkways across residential properties in North London. Frost resistant tiles and exterior grade adhesive are used on all external surfaces, and drainage falls are checked before any tile is laid.
We tile commercial kitchens, reception areas, and washrooms for landlords, letting agents, and small business premises across Islington and Haringey. All commercial tiling is completed with minimal disruption to occupants and fully documented on completion.
We carry out tiling as part of wider renovation and full property refurbishment projects across North London. Tiling is coordinated with other trades to ensure surfaces are correctly prepared and ready before installation begins, avoiding delays and rework.

Every tiling project starts with a site assessment. Surface condition, moisture levels, and layout are checked before work begins.
Includes:

Once preparation is complete, tiles are installed using suitable adhesive and fixing methods.
Includes:
Surface prep
Tile fixing
Cutting and alignment

The final stage focuses on grout application, sealing, and visual checks before handover.
Includes:
Grouting
Sealing
Final inspection
Site visit and scope assessment
Transparent costs and timelines
Trades coordinated and managed
Snagging cleared, project closed
Wall tiling in North London typically costs between £25 and £50 per square metre for labour, and floor tiling between £30 and £60 per square metre depending on tile size, layout complexity, and surface condition. A standard bathroom with full wall and floor tiling usually falls between £800 and £2,500 for labour. Kitchen splashback tiling is generally lower cost due to the smaller surface area involved. Outdoor tiling and large format tile installations cost more due to additional preparation and handling requirements. EBT Build provides a fully itemised written quote after a free site assessment covering labour, materials, and preparation separately so you know exactly what you are paying for before any work begins.3
Yes, and this applies to every wet area we tile without exception. Tanking membrane is applied to shower enclosures, wet room walls, and all high moisture surfaces before any tile is fixed. This creates a continuous waterproof layer behind the tiles that prevents moisture reaching the substrate and tracking into the surrounding wall or floor structure. Tiling directly onto an untreated surface in a wet area is one of the most common causes of water damage behind bathroom walls. By the time dampness becomes visible on the other side, the repair typically costs significantly more than the original tiling job. We do not tile over unprotected wet area surfaces regardless of how sound the existing substrate appears.
We install ceramic, porcelain, natural stone, mosaic, and large format tiles across walls and floors in bathrooms, kitchens, hallways, and outdoor spaces. Each tile type has different fixing, adhesive, and grout requirements. Natural stone requires sealing before use and different adhesive to ceramic or porcelain. Large format tiles require a flatter, more precisely levelled substrate and specialist adhesive to prevent hollow spots behind the tile. Mosaic tiles require additional time for alignment and grouting. We confirm the correct specification and fixing method for each tile type during the site assessment before any tiles are ordered or installed.
In most cases yes, provided the surrounding tiles are sound and the substrate behind the damaged area is intact. Individual tiles or a localised section can be removed and replaced without disturbing the rest of the surface. The main challenge with tile repairs is matching the existing tiles, particularly if the original batch has been discontinued or the tiles are an older format no longer in production. We assess the condition of the substrate and the adhesion of surrounding tiles before confirming whether targeted replacement is viable. Where an exact match cannot be found we advise on the closest available alternative or discuss whether a wider refresh makes more practical sense based on the age and condition of the existing tiling.
Timescales depend on the surface area, tile type, layout complexity, and the amount of preparation required before tiling can begin. A standard bathroom with full wall and floor tiling typically takes three to five working days including preparation, installation, grouting, and sealing. Kitchen splashback tiling can often be completed in one to two days. Wet rooms take longer due to the tanking and any gradient screeding required before tiles are laid. Large format tile installations and complex pattern layouts also extend the programme due to the additional precision required during fixing and alignment. EBT Build confirms a clear day by day schedule after the site assessment so you have a fixed timeline before any work starts.
We can work either way depending on what suits the project. Where homeowners supply their own tiles we check the specification before installation begins to confirm the tile is appropriate for the intended surface, wet zone, and usage level. Tiles that are not rated for floor use, insufficiently slip resistant for wet areas, or too porous for outdoor installation will be flagged before any work starts. We always recommend ordering a minimum of ten to fifteen percent more tiles than the measured area requires to account for cuts, breakages during installation, and future replacements if a tile is damaged after the job is complete. Running out of tiles mid project and finding the original batch is discontinued is a common and avoidable problem that causes significant delays and additional cost.
Reliable home refurbishment and roofing specialists delivering compliant, fully managed building work across the UK.
© 2026 EBT Build. All rights reserved.