A mansard loft conversion replaces a roof slope with a near-vertical wall, usually pitched at about 70 degrees, topped by a shallow upper roof, which creates almost a full extra storey. In London, it is the standard way to add a floor to Georgian and Victorian terraces with butterfly roofs hidden behind a front parapet. It almost always needs planning permission, and councils such as Islington and Camden expect a traditional design: set back behind the parapet, clad in natural slate, with small lead-clad dormers lined up with the windows below. Because the party walls are raised, the Party Wall Act applies. Allow six to nine months from first drawings to completion, of which the build itself typically takes 10 to 14 weeks.
What Is a Mansard Loft Conversion?
A mansard roof has two pitches on each side. The lower slope is steep, close to a wall, and the upper slope is shallow or almost flat. The form is named after François Mansart, the seventeenth-century French architect who made it popular.

In a loft conversion, the existing roof is taken down and rebuilt in this shape. Because the lower slope rises almost straight up, the room inside has close to full head height from wall to wall, unlike a standard pitched loft where the ceiling slopes down to the eaves.
It is one of several types of loft conversion, and the one that gains the most space.
Our loft conversions team builds mansards mainly on terraced houses in Islington, Hackney, Camden and Haringey, where they are part of the established roofscape.
Rear, Front and Double Mansards
A mansard can be built on the rear slope only, keeping the front roof and parapet line unchanged. This is often easier to get through planning on streets without existing front mansards.
A front and rear mansard rebuilds both slopes and gives the largest room. Many people call this a double mansard. The same term is also used in central London for a two-storey mansard on a tall building, so it is worth checking what a designer or neighbour means when they use it.
Mansards on Butterfly Roofs
Many Georgian and early Victorian terraces in London have a butterfly roof, also called a London or valley roof. Two shallow slopes fall inwards to a central gutter, hidden from the street by a front parapet, with a V-shaped profile visible at the rear.
There is almost no usable space inside, and no slope to put a dormer on. On these houses, a mansard is usually the only realistic way to add a room at the top of the house.
Is a Mansard Right for Your House?
A mansard suits some houses far better than others.
It usually works well on:
- Georgian and early Victorian terraces with a parapet and butterfly roof
- Terraces where several neighbours already have mansards
- Houses where you want a full extra floor, such as a bedroom with an en-suite and storage
It is harder to justify on:
- Terraces with a continuous, unbroken roofline and no existing roof extensions
- Listed buildings, where any roof change needs listed building consent
- Houses with a tall pitched roof that already gives good head height, where a rear dormer may do the job for less
If you are weighing a mansard against a rear dormer, our dormer loft conversion page shows what a dormer can achieve on a pitched roof.
Mansard Design Rules London Councils Expect
London boroughs publish their own design guidance. The details vary by borough and by street, but most follow the same principles. Islington’s Urban Design Guide and Camden’s planning guidance both support traditional mansards where they suit the terrace.

| Design element | What councils typically expect |
|---|---|
| Lower slope | About 70 degrees, so the mansard leans back from the street |
| Upper slope | Shallow; some guidance sets around 30 degrees, others accept a near-flat top hidden behind the parapet |
| Front parapet | Kept in place, with the mansard set back behind it |
| Setback | Enough to keep the parapet line clear; one Tower Hamlets conservation area guide sets at least 900 mm |
| Roof covering | Natural slate, usually Welsh slate or a close match |
| Dormers | Small, lead-clad, lined up with the windows below, and narrower than the main windows |
| Windows | Timber sash, painted; uPVC is rarely accepted on the front |
| Chimney stacks | Kept and raised above the new roof, not removed |
| Rear | V-shaped parapet profile kept or reflected in the design |
| Rainwater | Taken to the rear, with no new pipes on the front elevation |
Slate and Lead
The finish on a mansard is mostly roofing work. Natural slate on the steep slope, lead on the dormer cheeks and tops, and lead flashings at the party walls and chimneys are what make a mansard look right. Our slate roofing team handles the covering, with the same fixing standards used on a full roof.
Windows
Front dormers in conservation areas almost always need timber sashes. Slim double glazing in a traditional frame is often accepted, and our guide to double glazing in conservation areas explains what councils usually allow.
Planning Permission for a Mansard
A mansard changes the shape of the roof and usually rises above the existing ridge or parapet line, so it falls outside permitted development. In practice, every mansard needs a householder planning application.
Conservation areas add another layer. Most of Barnsbury, Canonbury, De Beauvoir and large parts of Camden Town and Stoke Newington are in conservation areas, where the design rules above are applied closely. Our guide to permitted development rights in Islington explains why roof extensions there always need an application.
Some streets also carry an Article 4 direction, which removes further rights, such as rooflights on the front slope.
What Strengthens an Application
Planning officers look at the terrace as a whole. An application is far more likely to succeed when:
- Neighbouring houses in the same terrace already have mansards of a similar design
- The design follows the borough’s published guidance closely
- Drawings show the mansard in the context of the whole street
- The house is between two existing mansards, where the new roof fills a gap
Where no mansards exist, a joint application with neighbours, or a pre-application enquiry to the council, is worth considering before paying for full drawings.
Timescale and Fee
A householder application usually takes eight weeks to be decided once validated. The council fee for a householder application in England is currently £548.
The Party Wall Act and Your Neighbours
On a terraced house, a mansard raises the party walls on both sides. That brings the work under the Party Wall etc. Act 1996.
You must serve a party structure notice on each neighbour at least two months before the party wall work starts. Neighbours can agree, or appoint a surveyor, in which case a party wall award sets out how the work will be done. Our party wall agreement guide covers notices, surveyors and timings in Islington and Hackney.
Serving notice early, ideally while planning is being decided, avoids delays to the start date. Talking to neighbours before notices arrive also helps, especially where scaffolding has to go in front of their houses.
How a Mansard Is Built
A mansard is closer to building a new storey than converting a loft. The sequence below is typical for a terraced house.

Scaffolding and Temporary Roof
Scaffolding goes up front and back, often with a temporary roof over the top. This keeps the house dry while the old roof is open. On narrow London streets, the scaffold usually needs a council licence.
Strip and Structure
The old roof covering and timbers are removed. Steel beams are installed to carry the new floor and roof, sized by a structural engineer. Our guide on structural engineer vs builder explains who designs what and why the calculations come first.
The party walls are raised in brickwork, and chimney stacks are rebuilt or extended as needed.
Frame, Dormers and Roof
The steep slopes are framed in timber, the dormers are built and clad in lead, and the shallow upper roof is decked and covered. The slopes are then insulated, felted, battened and slated.
First Fix, Stairs and Finishes
Electrics, plumbing and heating are run to the new floor. The new staircase is usually built last, breaking through from the floor below only when the new floor is weathertight. This keeps dust and disruption in the rest of the house to a minimum.
Plastering, joinery, bathroom fitting and decoration follow.
Typical Timeline
| Stage | Typical duration |
|---|---|
| Survey, measured drawings and design | 4 to 8 weeks |
| Planning application decision | About 8 weeks |
| Party wall notices and awards | 2 months or more, run alongside planning |
| Structural design and building control | 3 to 6 weeks |
| Build on site | 10 to 14 weeks |
From first drawings to moving into the new room, six to nine months is realistic, longer if planning needs revising.
Building Regulations for a Mansard
A mansard needs full building regulations approval. The main areas are fire safety, stairs, structure and insulation.
Fire Safety
A mansard on a two storey house creates a third storey with a floor more than 4.5 metres above ground. Windows at that height are not treated as safe escape routes, so the escape route has to be the staircase.
That usually means a protected stair running from the new floor down to the front door, with fire doors to the habitable rooms that open onto it. Mains-powered, interlinked smoke and heat alarms are fitted on every level.
If the mansard sits on a house that already has three storeys, the new top floor will be more than 7.5 metres above ground. Building control will then expect extra measures, such as a sprinkler system or a second escape route, so it is worth discussing early.
Stairs
The new staircase must meet Approved Document K. For loft conversions, headroom can be reduced to 1.9 metres at the centre of the stair and 1.8 metres at the side. Many councils expect the stair headroom to come from a rear dormer within the mansard rather than a box on the roof.
Fitting a new flight also affects the stair below. Where the existing staircase needs adjusting, our staircase repairs team handles the joinery so old and new flights match.
Structure and Insulation
The structural engineer’s calculations cover the steels, the raised party walls and the loads carried down to the foundations. The new walls and roof must also meet current insulation standards, which on a mansard means fitting insulation within the steep slopes and the upper roof without losing too much internal space.
Living in the House During the Build
Most families stay at home during a mansard build. The noisiest and wettest work happens above the existing ceilings, and the temporary roof keeps the house dry.
Expect disruption on the top floor of the existing house, particularly when the new stair is opened up. Rooms directly below the roof may need to be cleared for a few weeks. Dust sheets, sealed doors and a planned sequence keep the rest of the house usable.
What Does a Mansard Cost?
Mansards cost more than dormer conversions because of the steelwork, raised party walls, slate and lead work, and the longer build. Our guide to loft conversion cost in London sets out current price ranges for mansards alongside other loft types, including what pushes the budget up.
The main cost drivers are the width of the house, front only or front and rear construction, the number of dormers, conservation area materials, access for scaffolding, and the bathroom and finish specification.
Mansard vs Extending Elsewhere
A mansard is not the only way to add space. On some houses, a rear or side extension gives the same floor area with less disruption to the roof and neighbours. On others, the garden is too small or too valuable to build on, and the roof is the obvious place to go.
Our comparison of loft conversion vs extension looks at cost, space, planning and value side by side.
Frequently Asked Questions
Does a mansard loft conversion need planning permission?
Yes, almost always. A mansard changes the shape of the roof and is not covered by permitted development. In conservation areas the council will also check the design against its own guidance.
What angle is a mansard roof?
The lower slope of a traditional London mansard is usually about 70 degrees. The upper slope is shallow, often around 30 degrees or close to flat behind the parapet, depending on the borough’s guidance.
How long does a mansard loft conversion take to build?
The build usually takes 10 to 14 weeks on site. Including design, planning and party wall notices, six to nine months from start to finish is typical.
What is a double mansard?
The term usually means a mansard built on both the front and rear slopes. In parts of central London, it can also mean a two storey mansard on a tall building.
Can you build a mansard on a terraced house?
Yes. Terraced houses are where mansards are most common in London. The party walls on both sides are raised, so notices under the Party Wall Act are needed.
Can I live at home during a mansard conversion?
Usually yes. A temporary roof keeps the house dry, and the new staircase is opened up near the end of the build to limit dust and disruption below.
Will my neighbours be affected?
They will see scaffolding and hear building work, and their party walls will be raised. Serving party wall notices early and talking to neighbours before work starts keeps things smoother.
Planning Your Mansard
A mansard is the biggest loft conversion you can build on a terrace, and on the right street it adds a full floor that looks original to the house. The key is to design it the way the council expects, deal with party walls early, and plan the fire safety and stairs from the start.
Start with a measured survey and a look at what neighbours have already built. Those two steps tell you quickly whether a mansard is realistic for your house and how to design one that gets approved.